Stellar · Plot 208B · Revision M · 1 Sep 2026

Plot 208B · Structure setting-out · Architect → SE

A-S01 to A-S04. USER LOCK 1 Sep 2026: A5 at 4'-4" / 61'-4" in the west wall at the parking cut (not line 5). B5 omitted. Grid B stops at B4. DH porch 8'-0" two jambs (PJ1 / PJ2) footing to roof, no mid post, no transfer. DESIGN INTENT / COORDINATION — not IFC, not a GMADA sanction, not BBS. No soil SBC invented. Member sizes HOLD.

Project PLOT 208B Residence · GMADA New Chandigarh Plot 50'-0" × 90'-0" · 500 sq yd Prepared by Stellar · issued for coordination Discipline ARCHITECTURAL Architect → Structure · wall-junction columns Drawing COLUMN SETTING-OUT PLAN Rev M · 1 Sep 2026 Sheet A-S01 Scale 1:100 at A3 A3 landscape Status DESIGN INTENT COORDINATION Not for construction. Member sizes provisional pending SE. Not IFC. COMPOUND 4" AACSW GATEEXT 8" AAC (200 mm)INT 6" (user) / 100 mm dwgOPEN CAR PARKINGsedan + SUV · open sky · no posts8' × 4' D.H. VOIDno slab · no mid postSIT. BALC 8' × 3'ATRIUM VOIDvoid walls · no transferA4'-4"D44'-8"112'-0"575'-0"A561'-4"50'-0" PLOT4'-4"5'-4"12'-0"15'-0"90'-0" PLOT8'-0" CLEAR4'-0"7'-8" PARKING · NO BEAMREAR SETBACK 12'-0" (NORTH)FRONT SETBACK 15'-0" (SOUTH / STREET)CONSTRUCTIBLE 41'-0" × 63'-0"A1COL · SEA2COL · SEA3COL · SEA4COL · SEA5COL · SEB1COL · SEB2COL · SEB3COL · SEB4COL · SEF2COL · SEF3COL · SEJ1COL · SEJ2COL · SEV1COL · SEV2COL · SEV3COL · SEV4COL · SEL1COL · SEL2COL · SEE1COL · SEE2COL · SEE3COL · SEM1COL · SEM3COL · SEK1COL · SEK3COL · SEK5COL · SED1COL · SED2COL · SED3COL · SED4COL · SED5COL · SED6COL · SEPJ1JAMBPJ2JAMBB5 OMITred X only · not a porch postA5 4'-4" E / 61'-4" SIN WEST WALL · NOT LINE 5NOT a porch post · NOT in stalls11'-7" south of A4 (49'-9")footing N+E into housePJ1 12'-0" / 79'-8"WEST JAMB · PORTICO OUTER SWfooting → roof · no mid postPJ2 20'-0" / 79'-8"DRAWING-ROOM JAMBfooting → roofK5 34'-1" / 75'-8"IN DRAWING SOUTH WALLB4 16'-0" / 49'-9"GRID B STOPS HEREdo not hang B on PJ1–PJ2 N SCALE 1:100 at A3010 ft20 ftNotesA-S01 COLUMN SETTING-OUT · REV MUSER LOCK 1 SEP 202635 wall-junction columns + B5 OMIT (red X).No 4x5 overlay through rooms. See XY list.1. Setting-out from NW plot corner. X east, Y south. Plot 50'-0" × 90'-0". South = street.2. Envelope ticks only: A 4'-4" D 44'-8" line 1 = 12'-0" line 5 = 75'-0". Constructible ~41'-0" x 63'-0".3. A5 is flush in the WEST WALL at the parking cut: 4'-4" E / 61'-4" S. NOT a line-5 post. NOT holding the porch. KEEP A5.4. Parking 0-11'-2" E, 61'-4" to 75'-0" S. Open sky, sedan+SUV, no stall columns.5. PJ1 / PJ2: 8'-0" clear, both jambs footing→roof. Portico 4'-0" south of house face (79'-8"). No third post. B5 OMIT. Grid B stops at B4.6. Hatched squares are GRAPHIC ~9" poche, not a size. Mark COL · SE. SE sizes the member.7. Isolated footings 5'-0" sq INDICATIVE. Founding −4'-6" NGL PLACEHOLDER. No SBC.8. All RCC as per structural design. Foundations to hard soil / soil report.9. EXT 8" AAC (200 mm). INT 6" (user) / 100 mm drawings. Compound 4" AAC. Not 9" house AAC.10. Atrium / open court to sky, no transfer. Seismic Zone IV. DESIGN INTENT — not IFC. SIZE HOLD · NOT IFC · SE PICKS Columns 230 × 450 (takeoff) AND 230 × 600 (old C-01). Show both. Do not issue a fake size. Beams 230 × 450 · plinth 230 × 300 · slab 125 mm Footings 5'-0" sq × 1'-6" INDICATIVE. Founding −4'-6" NGL PLACEHOLDER. No SBC. 35 COLUMNS · WALL JUNCTIONS A1-A5 · B1-B4 (no B5) · F/J/V/L/E/M/K/D + PJ1 / PJ2 jambs. B5 = OMIT (red X, no bubble). Stellar · Plot 208B · DLF Mullanpur / GMADA New Chandigarh.West FF balcony 3'-6" cantilever · East 3'-6" · North 5'-9" (outer 6'-3").No walkway over NE mandir. West stair dog-leg. SW gate.C-01A wrongly parked A5 on line 5 — this sheet overrides.
A-S01 Column setting-out plan · 1:100 at A3 · wall-junction columns
Project PLOT 208B Residence · GMADA New Chandigarh Plot 50'-0" × 90'-0" · 500 sq yd Prepared by Stellar · issued for coordination Discipline ARCHITECTURAL 230 × 300 HOLD · isolated footings indicative Drawing FOUNDATION + PLINTH / GRADE BEAMS Rev M · 1 Sep 2026 Sheet A-S02 Scale 1:100 at A3 A3 landscape Status DESIGN INTENT COORDINATION Not for construction. Member sizes provisional pending SE. Not IFC. COMPOUND 4" AACSW GATEEXT 8" AAC (200 mm)INT 6" (user) / 100 mm dwgOPEN CAR PARKINGsedan + SUV · open sky · no posts8' × 4' D.H. VOIDno slab · no mid postATRIUM VOIDvoid walls · no transferGB-A (stops A5)GB-W STOPS B4GB-EGB-PJ PJ1–PJ2 8' CLEARNO BEAM OVER PARKINGA5 FTNG 5'-0" N+E · NOT IN PARKINGA1COL · SEA2COL · SEA3COL · SEA4COL · SEA5COL · SEB1COL · SEB2COL · SEB3COL · SEB4COL · SEF2COL · SEF3COL · SEJ1COL · SEJ2COL · SEV1COL · SEV2COL · SEV3COL · SEV4COL · SEL1COL · SEL2COL · SEE1COL · SEE2COL · SEE3COL · SEM1COL · SEM3COL · SEK1COL · SEK3COL · SEK5COL · SED1COL · SED2COL · SED3COL · SED4COL · SED5COL · SED6COL · SEPJ1JAMBPJ2JAMBB5 OMITred X only · not a porch postA4'-4"D44'-8"112'-0"575'-0"A561'-4"8'-0" CLEAR4'-0" N SCALE 1:100 at A3010 ft20 ftNotesA-S02 FOUNDATION + GRADE BEAMS · REV MPlinth / grade beams 230 × 300 HOLD.GB-A west wall G1 to A5 only. Stop at cut. NO beam A5 → south compound. NO beam across parking to PJ1.GB-W west-wing east wall G1 to B4. STOP. No B5. Do not hang B on the PJ1–PJ2 beam.GB-E east wall G1 to D6.GB-N north wall A1-D1.GB-S drawing/kitchen south, PJ2-K5-D6. NO A5-PJ1 over parking.Beams sit on walls. No 4x5 overlay.GB-PJ PJ1–PJ2 at portico outer 79'-8" AND at house face between jambs. 8' clear. No mid post.Void ring follows court walls. No transfer.Longest GF wall span D3-D4 = 20'-7" NS.A5 footing INSIDE the house: projects NORTHand EAST. South face at parking cut. Neversouth into parking granite. Omit in yard.Isolated footings 5'-0" sq × 1'-6" INDICATIVEunder every kept column (35 nos). Founding−4'-6" NGL PLACEHOLDER. PCC lean below.No soil report. No SBC invented.All RCC as per structural design.Foundations to hard soil / soil report.Seismic Zone IV. DESIGN INTENT — not IFC. SIZE HOLD · NOT IFC · SE PICKS Columns 230 × 450 (takeoff) AND 230 × 600 (old C-01). Show both. Do not issue a fake size. Beams 230 × 450 · plinth 230 × 300 · slab 125 mm Footings 5'-0" sq × 1'-6" INDICATIVE. Founding −4'-6" NGL PLACEHOLDER. No SBC. Red dashed = A5 footing offset N+E. Grey dashed = typical 5' sq.A5–PJ1 E–W = 7'-8" is PARKING: no south beam, no third post.West parking open sky. No stall columns. No beam to compound.Stellar · Plot 208B · DLF Mullanpur / GMADA New Chandigarh.
A-S02 Foundation + plinth / grade beams · 1:100 at A3
Project PLOT 208B Residence · GMADA New Chandigarh Plot 50'-0" × 90'-0" · 500 sq yd Prepared by Stellar · issued for coordination Discipline ARCHITECTURAL Spans labelled · sizes HOLD · no transfer Drawing BEAM LAYOUT GF / FF Rev M · 1 Sep 2026 Sheet A-S03 Scale 1:100 at A3 A3 landscape Status DESIGN INTENT COORDINATION Not for construction. Member sizes provisional pending SE. Not IFC. OPEN CAR PARKINGsedan + SUV · open sky · no postsATRIUM VOIDvoid walls · no transferA1COL · SEA2COL · SEA3COL · SEA4COL · SEA5COL · SEB1COL · SEB2COL · SEB3COL · SEB4COL · SEF2COL · SEF3COL · SEJ1COL · SEJ2COL · SEV1COL · SEV2COL · SEV3COL · SEV4COL · SEL1COL · SEL2COL · SEE1COL · SEE2COL · SEE3COL · SEM1COL · SEM3COL · SEK1COL · SEK3COL · SEK5COL · SED1COL · SED2COL · SED3COL · SED4COL · SED5COL · SED6COL · SEPJ1JAMBPJ2JAMBB5 OMITred X only · not a porch post11'-8"8'-6"11'-7"8'-7"15'-10"8'-0"20'-7"16'-0"8'-0"14'-1"D.H. PORCHGF / PLINTH FRAMINGOPEN CAR PARKINGsedan + SUV · open sky · no postsATRIUM VOIDvoid walls · no transferA1COL · SEA2COL · SEA3COL · SEA4COL · SEA5COL · SEB1COL · SEB2COL · SEB3COL · SEB4COL · SEF2COL · SEF3COL · SEJ1COL · SEJ2COL · SEV1COL · SEV2COL · SEV3COL · SEV4COL · SEL1COL · SEL2COL · SEE1COL · SEE2COL · SEE3COL · SEM1COL · SEM3COL · SEK1COL · SEK3COL · SEK5COL · SED1COL · SED2COL · SED3COL · SED4COL · SED5COL · SED6COL · SEPJ1JAMBPJ2JAMBB5 OMITred X only · not a porch post11'-8"8'-6"11'-7"8'-7"15'-10"8'-0"20'-7"16'-0"8'-0"14'-1"8×3 GALLERYNO SLAB 8×4W CANT. 3'-6"no postsE CANT. 3'-6"N BALC 5'-9"no walkway over NE mandirFF/RF ON B STOPS B4FF FRAMING N SCALE 1:100 at A3 (each plan)010 ft20 ftNotesGF / plinth: beams on walls. Longest house span D3-D4 = 20'-7" (east dining).Porch 8'-0". N-wall A1-B1 11'-8" · B1-L1 8'-6" · L1-M1 11'-7" · M1-D1 8'-7". W A1-A2 15'-10".FF: sitting balcony slab 8'-0" × 3'-0" ties PJ1–PJ2. NO slab in the 8 × 4 D.H. void.West / east / north balconies are CANTILEVERS — no extra columns. Grid B stops at B4 at FF and roof.Beam size HOLD: 230 × 450 (takeoff) AND 230 × 600 (old C-01) — SE picks. Slab 125 mm provisional.No transfer girder. Atrium open to sky. All RCC as per structural design. Foundations to hard soil / soil report. SIZE HOLD · NOT IFC · SE PICKS Columns 230 × 450 (takeoff) AND 230 × 600 (old C-01). Show both. Do not issue a fake size. Beams 230 × 450 · plinth 230 × 300 · slab 125 mm Footings 5'-0" sq × 1'-6" INDICATIVE. Founding −4'-6" NGL PLACEHOLDER. No SBC. RB-PJ at roof may cap the two jambs (8' span) — not a transfer, grid B does not land on it.Seismic Zone IV. DESIGN INTENT / COORDINATION. Not IFC. Not BBS.Stellar · Plot 208B · DLF Mullanpur / GMADA New Chandigarh.
A-S03 Beam layout GF / FF · 1:100 at A3
Project PLOT 208B Residence · GMADA New Chandigarh Plot 50'-0" × 90'-0" · 500 sq yd Prepared by Stellar · issued for coordination Discipline ARCHITECTURAL wall-junction columns + B5 omit · DESIGN INTENT Drawing SCHEDULES + NOTES Rev M · 1 Sep 2026 Sheet A-S04 N.T.S. at A3 A3 landscape Status DESIGN INTENT COORDINATION Not for construction. Member sizes provisional pending SE. Not IFC. COLUMN SCHEDULE · COL · SE · WALL JUNCTIONS + B5 OMITMarkGridX from NWY from NWStoreysFootingNoteA1wall T4'-4"12'-0"GF+FF+RF5'-0" sq IND.NW corner · N+W extA2wall T4'-4"27'-10"GF+FF+RF5'-0" sq IND.W ext T · guest / stairA3wall T4'-4"35'-10"GF+FF+RF5'-0" sq IND.W ext T · stair / bedroomA4wall T4'-4"49'-9"GF+FF+RF5'-0" sq IND.W ext T · bedroom / GF toiletA5wall T4'-4"61'-4"GF+FF+RF5'-0" sq IND.W ext at parking cut · LOCKED 4'-4" / 61B1wall T16'-0"12'-0"GF+FF+RF5'-0" sq IND.N ext T · toilet / laundryB2wall T16'-0"27'-10"GF+FF+RF5'-0" sq IND.crossing · guest / store / stairB3wall T16'-0"35'-10"GF+FF+RF5'-0" sq IND.T · stair / bedroom eastB4wall T16'-0"49'-9"GF+FF+RF5'-0" sq IND.bedroom SE / foyer N · B STOPS (no B5)F2wall T11'-2"61'-4"GF+FF+RF5'-0" sq IND.parking-cut east · powder S wall (not inF3wall T11'-2"65'-0"GF+FF+RF5'-0" sq IND.foyer SW · porch W wall north TJ1wall T12'-0"65'-0"GF+FF+RF5'-0" sq IND.porch W wall at foyer S · in wallPJ1wall T12'-0"79'-8"FTNG→ROOF5'-0" sq IND.porch W jamb · portico SW · footing→roJ2wall T20'-0"65'-0"GF+FF+RF5'-0" sq IND.porch E / drawing SW jog T · in wallPJ2wall T20'-0"79'-8"FTNG→ROOF5'-0" sq IND.porch E jamb · portico SE · footing→roV1wall T21'-8"27'-10"GF+FF+RF5'-0" sq IND.void NW / lounge S / foyer NEV2wall T21'-8"43'-1"GF+FF+RF5'-0" sq IND.void SWV3wall T21'-8"57'-10"GF+FF+RF5'-0" sq IND.drawing NWV4wall T21'-8"65'-0"GF+FF+RF5'-0" sq IND.foyer SE / drawing W jog · not in 8' opeL1wall T24'-6"12'-0"GF+FF+RF5'-0" sq IND.N ext T · laundry / loungeL2wall T24'-6"27'-10"GF+FF+RF5'-0" sq IND.lounge SW / store SEE1wall T30'-10"27'-10"GF+FF+RF5'-0" sq IND.void NE / dining NWE2wall T30'-10"43'-1"GF+FF+RF5'-0" sq IND.void SE / dining WE3wall T30'-10"48'-5"GF+FF+RF5'-0" sq IND.dining SWM1wall T36'-1"12'-0"GF+FF+RF5'-0" sq IND.N ext T · lounge / mandirM3wall T36'-1"27'-10"GF+FF+RF5'-0" sq IND.lounge SE / pantry SWK1wall T34'-1"48'-5"GF+FF+RF5'-0" sq IND.kitchen NW / dining S / drawing NEK3wall T34'-1"64'-5"GF+FF+RF5'-0" sq IND.kitchen W T · dry / wetK5wall T34'-1"75'-8"GF+FF+RF5'-0" sq IND.drawing SE · S wall (was C5) · followsD1wall T44'-8"12'-0"GF+FF+RF5'-0" sq IND.NE corner · N+E extD2wall T44'-8"20'-7"GF+FF+RF5'-0" sq IND.E ext T · mandir / pantryD3wall T44'-8"27'-10"GF+FF+RF5'-0" sq IND.E ext T · pantry / diningD4wall T44'-8"48'-5"GF+FF+RF5'-0" sq IND.E ext T · dining / kitchenD5wall T44'-8"64'-5"GF+FF+RF5'-0" sq IND.E ext T · dry / wetD6wall T44'-8"75'-0"GF+FF+RF5'-0" sq IND.SE corner · wet kitchenB5OMIT16'-0"75'-0"—NONEOMITTED — not in 8' opening, not a porch postCount: 35 kept at wall junctions + B5 OMIT (do not cast). No 4×5. No parking posts.BEAM SCHEDULE · SIZE HOLD · beams on wallsMarkGridFromToSpanSize HOLDLevelGB-AW wallA1A549'-4"230x300 PB / 230x450stops A5 · no parkingGB-WW-wing EB1B437'-9"230x300 PB / 230x450STOPS B4 · no B5GB-EE wallD1D663'-0"230x300 PB / 230x450D3-D4 20'-7" longestGB-NN wallA1D140'-4"230x300 PB / 230x450A1-B1-L1-M1-D1GB-VvoidV1E2wall ring230x300 PB / 230x450court walls · no transferGB-Kkit WK1K527'-3"230x300 PB / 230x450kitchen / drawing WGB-SS wallK5D610'-7"230x300 PB / 230x450drawing SE · NO A5-PJ1GB-PJporchPJ1PJ28'-0"230×300PB outer 79'-8"GB-PJ-FporchPJ1PJ28'-0"230×300PB house face 75'-8"FB-SITporchPJ1PJ28'-0"×3'-0"slab 125 mmFF gallery — not a porch roofRB-PJporchPJ1PJ28'-0"230×450 HOLDRF tie · NOT a transferBeams on walls only. Longest D3-D4 20 ft 7 in. 230x450 takeoff AND 230x600 old C-01 — show both, SE picks.EXPLICIT: no transfer; B stops B4; no south beam over parking; no post in the 8' opening; do not hang B on PJ1–PJ2. SIZE HOLD · NOT IFC · SE PICKS Columns 230 × 450 (takeoff) AND 230 × 600 (old C-01). Show both. Do not issue a fake size. Beams 230 × 450 · plinth 230 × 300 · slab 125 mm Footings 5'-0" sq × 1'-6" INDICATIVE. Founding −4'-6" NGL PLACEHOLDER. No SBC. NotesNOTES · A-S01 TO A-S041. All RCC as per structural design.2. Foundations to hard soil / soil report.3. No SBC invented. No IFC sizes issued.4. A5 Y = 61'-4" parking-cut south face of west wall. 11'-7" south of A4. KEEP A5. Do not slide to 75'-0".5. A5 footing N+E into house, never south into parking. Omit in yard.6. B5 omitted. Grid B stops at B4.7. PJ1 12'-0" / 79'-8" · porch SW. PJ2 20'-0" / 79'-8" · drawing jamb.8. West parking open sky, no posts. W/E FF balcony 3'-6" cantilever. N balcony 5'-9", outer 6'-3" from N. No walkway over NE mandir.9. Atrium B–C / 2–3 open to sky. West stair dog-leg. SW gate.10. EXT 8" AAC (200 mm). INT 6" (user) / 100 mm drawings. Compound 4" AAC. Not 9" house AAC.11. Seismic Zone IV.12. DESIGN INTENT / COORDINATION. Not IFC. Not GMADA sanction. Not BBS.13. C-01A wrongly parked A5 on line 5. This set overrides that location.14. Stellar · Plot 208B · DLF Mullanpur / GMADA New Chandigarh. Rev M 1 Sep 2026.
A-S04 Column + beam schedules + notes · N.T.S. at A3