Civil & Structural Drawings
Foundation, column layout and first-floor framing coordinated to the locked architectural grid. Grid 4 × 5 with B5 omitted at the porch face. Nineteen house columns + PJ1 west jamb (12'-0") + PJ2 drawing-room (20'-0"). South porch DOUBLE HEIGHT 8'-0" clear (see C-01A). Line 5: A5 — PJ1 — PJ2 — C5 — D5. Grid B stops at B4 — not hung on the PJ1–PJ2 beam. Member sizes remain provisional pending the structural engineer and the soil report.
Sheet Title Level Scale
C-01 Foundation & column layout Ground floor +900 1:130 at A3 C-02 First floor framing plan First floor +4558 1:130 at A3
Soil report still outstanding — footings remain indicative No geotechnical report has been received. Isolated footing sizes on C-01 are indicative only and must be reissued against the soil report before any excavation. Column size HOLD: 230 × 450 takeoff AND 230 × 600 on this C-01 — do not pick a fake size. Beams 230 × 300 / 230 × 450 PROVISIONAL. IS 13920 Seismic Zone IV. Founding 4'-6" below NGL PLACEHOLDER. No SBC.
Grid complete — missing-column hold closed Revision C places columns at every node of the 4 × 5 grid, including B-3 and C-3. The 32'-0" unsupported run is gone. Longest span is 17'-9". No transfer girder. Grid C-4 in the foyer is an architectural pilaster pair, not a defect.
Project
PLOT 208B
Residence · GMADA, New Chandigarh
Plot 50'-0" × 90'-0" · 500 sq yd
Prepared by Stellar · issued for coordination
Discipline
CIVIL / STRUCTURAL
Ground floor level +900
Drawing
FOUNDATION & COLUMN LAYOUT
B5 omitted · 19 house + 2 porch footings indicative
Sheet
C-01
Rev F · 29 Aug 2026
Scale 1:130 at A3
Status
NOT FOR
CONSTRUCTION
Design intent / coordination.
Member sizes, loads and routes to be
confirmed by appointed consultants.
A1
B1
C1
D1
A2
B2
C2
D2
A3
B3
C3
D3
A4
B4
C4
D4
A5 IN WALL
B5 OMIT
C5
D5
A
B
C
D
1
2
3
4
5
C-4 IN FOYER Architectural pilaster pair — not a defect
11'-8"
13'-6"
15'-2"
40'-4" A–D
16'-0"
17'-9"
11'-0"
16'-6"
61'-3" 1–5
GUEST TOILET-2
GUEST BR-2
LAUNDRY
STORE
FAMILY LOUNGE
MANDIR
PANTRY
DINING AREA
GUEST BEDROOM-1
DRY KITCHEN
WET KITCHEN
FOYER
DRAWING ROOM
PORCH
OPEN CAR PARKING
STAIRCASE
OPEN AREA
POWDER ROOM
TOILET/BATH
C01
C02
C03
C04
C05
C06
C07
C08
C09
C10
C11
C12
C13
C14
C15
C16
C17
B5 OMIT
C19
C20
Legend
COL · SE · 19 house (B5 omitted) + PJ1/PJ2 · size HOLD 230×450 vs 230×600
Isolated footing, size subject to soil report
Plinth beam 230 × 300 provisional
Buildable envelope 41'-0" × 63'-0"
C-4 foyer pilaster — intentional, not a defect
Atrium bay B–C / 2–3 — void above, no transfer
Column setting out
Coordinates to grid intersection, from the north-west
plot corner. X east, Y south. B1–B4 on B; B5 omitted at porch. PJ1+PJ2.
C01 A-1 4'-4" / 12'-0"
C02 B-1 16'-0" / 12'-0"
C03 C-1 29'-6" / 12'-0"
C04 D-1 44'-8" / 12'-0"
C05 A-2 4'-4" / 29'-9"
C06 B-2 16'-0" / 29'-9"
C07 C-2 29'-6" / 29'-9"
C08 D-2 44'-8" / 29'-9"
C09 A-3 4'-4" / 47'-6"
C10 B-3 16'-0" / 47'-6"
C11 C-3 29'-6" / 47'-6"
C12 D-3 44'-8" / 47'-6"
C13 A-4 4'-4" / 58'-6"
C14 B-4 16'-0" / 58'-6"
C15 C-4 29'-6" / 58'-6"
C16 D-4 44'-8" / 58'-6"
C17 A-5 4'-4" / 75'-0" IN WEST WALL · omit in yard
C18 B-5 OMITTED AT PORCH FACE
C19 C-5 29'-6" / 75'-0"
C20 D-5 44'-8" / 75'-0"
PJ1 west jamb 12'-0" / 75'-0" · 8' clear to PJ2
PJ2 drawing 20'-0" / 75'-0" · then PJ2–C5 ~9'-6"
Notes
NOTE 1 — No geotechnical report was available when this
drawing was prepared. Footing size, depth and type are
indicative only and must be reissued against the soil report.
NOTE 2 — Seismic Zone IV. Ductile detailing to IS 13920 is
mandatory at all beam–column junctions.
NOTE 3 — NO COLUMN IN 8'-0" D.H. PORCH — B5 OMITTED AT PORCH FACE;
PJ1 WEST CORNER, PJ2 DRAWING CORNER. Grid B stops at B4. No transfer.
NOTE 4 — Grid C-4 lands in the foyer. Treat as an architectural
pilaster pair framing the view from the front door to the atrium.
NOTE 5 — Concrete M25, reinforcement Fe500D. Cover: footings
50 mm, columns 40 mm, beams 25 mm. All member sizes
PROVISIONAL pending SE design and the soil report.
NOTE 6 — Column faces on grid centre line. Offsets to be
confirmed before setting out. Datum: NW plot corner.
NOTE 7 — Internal walls 100 mm Zmart AAC with steel mesh.
External walls 200 mm. No chasing of AAC.
NOTE 8 — This sheet supersedes C-01 Rev A (old grid, 18
columns, missing B-3 / C-3, 32'-0" unsupported run).
N
0
10 ft
SCALE 1:130 approx. at A3
PJ1
PJ2
8'-0" CLEAR · NO POST IN OPENING
A5 FLUSH IN WEST WALL / OMIT IN YARD — SE
Footing inside house, not in west parking. No stall columns.
Bay A–B / 4–5 has no yard post. No transfer girder over parking.
Do not put A5 in the south compound at the gate.
C-01 · Foundation and column layout · Rev C
Project
PLOT 208B
Residence · GMADA, New Chandigarh
Plot 50'-0" × 90'-0" · 500 sq yd
Prepared by Stellar · issued for coordination
Discipline
CIVIL / STRUCTURAL
First floor level +4558
Drawing
FIRST FLOOR FRAMING PLAN
Beams on all grid lines · void one bay only
Sheet
C-02
Rev F · 29 Aug 2026
Scale 1:130 at A3
Status
NOT FOR
CONSTRUCTION
Design intent / coordination.
Member sizes, loads and routes to be
confirmed by appointed consultants.
11'-8" × 16'-0"
11'-8" × 17'-9"
11'-8" × 11'-0"
11'-8" × 16'-6"
13'-6" × 16'-0"
13'-6" × 11'-0"
13'-6" × 16'-6"
15'-2" × 16'-0"
15'-2" × 17'-9"
15'-2" × 11'-0"
15'-2" × 16'-6"
CANTILEVER BALCONY 4'-0"
−300
−300
−300
−200
ATRIUM VOID — ONE BAY
B–C × 2–3 · 13'-6" × 17'-9" · beams continuous
SLAB OVER SOUTH PORCH FF balcony — not a void
A1
B1
C1
D1
A2
B2
C2
D2
A3
B3
C3
D3
A4
B4
C4
D4
A5 IN WALL
B5 OMIT
C5
D5
FB1
FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
A
B
C
D
1
2
3
4
5
LONGEST SPAN 17'-9"
11'-8"
13'-6"
15'-2"
40'-4" A–D
16'-0"
17'-9"
11'-0"
16'-6"
61'-3" 1–5
BEDROOM-02
TOILET-1
WALK-IN
TOILET-2
WALK-IN
BEDROOM-03
BALCONY (NORTH)
STAIR
LINEN STORE
UTILITY ROOM
GALLERY
PANTRY
MASTER BEDROOM-01
WALK-IN
SOUTH-EAST DECK
CANTILEVERED
LIVING ROOM
TOILET
CANTILEVERED
N-E OPEN DECK
WALK-IN STORE
Legend
Floor beam 230 × 450 provisional
Two-way slab 125 mm provisional
Slab over south porch (not a void)
Atrium void — bay B–C / 2–3 only
Sunken slab (−300 toilets / −200 wet)
Column continuous from foundation
Slab schedule
Slab thickness
125 mm provisional, two-way
Concrete
M25, 20 mm aggregate
Reinforcement
Fe500D, cover 20 mm soffit
Largest solid panel
15'-2" × 17'-9" (C–D / 2–3)
Longest span
17'-9" (lines 2–3)
Transfer girder
Not required
Cantilever balcony
4'-0" projection, south face
Live load
2.0 kPa residential; terrace IS 875-2
Notes
NOTE 1 — Beam marks FB1 onward are layout references only.
Sections and reinforcement to be issued by the structural
engineer. All sizes PROVISIONAL pending SE + soil report.
NOTE 2 — Beams on grid lines B and C run continuously past
the atrium, supported at B-2, C-2, B-3 and C-3. No missing
nodes. The void is a slab opening, not a transfer condition.
NOTE 3 — D.H. porch 8'-0" clear. B5 omitted. PJ1–PJ2 8' span; PJ2–C5 ~9'-6".
FF sitting balcony 8' × 3' ties PJ1–PJ2. Do NOT hang grid B on that beam.
Atrium (B–C / 2–3) is the other void. No transfer. Size HOLD.
NOTE 4 — Sunken zones must be finalised before slab
detailing. 300 mm toilets, 200 mm wet kitchen / utility.
NOTE 5 — All service penetrations to be sleeved at the pour.
Refer sheets E-02 and P-02. No coring after casting without
written approval.
NOTE 6 — Seismic Zone IV, IS 13920. Cover beams 25 mm.
Panel dimensions are grid to grid, not clear spans.
NOTE 7 — This sheet supersedes C-02 Rev A (void drawn over
the porch, missing B-3 / C-3, 32'-0" run, transfer girder).
N
0
10 ft
SCALE 1:130 approx. at A3
PJ1
PJ2
A5 FLUSH IN WEST WALL / OMIT IN YARD — SE
Footing inside house, not in west parking. No stall columns.
Bay A–B / 4–5 has no yard post. No transfer girder over parking.
Do not put A5 in the south compound at the gate.